During the remodel of 2008 the following changes were completed, replaced the old shingles with 35 year shingles, added new gutters with gutter guards, replaced both central air units along with all ducts, updated boiler and replaced zone control valves, replaced all plumbing (both supply and waste) to point of city’s connection, replaced most of the flooring (solid oak tongue & groove in most areas and ceramic tiles in the kitchen and bathrooms), replaced all cabinets with quality maple cabinets with self-closing drawers and installed stainless steel refrigerator, dishwasher, stove and micro vent. Front door was also replaced.

Location